Construction of a new to industry petrol filling station on a Greenfield land parcel adjacent to an established restaurant and hotel.

The site access road was shared with the neighbouring properties which were already trading. It was vital to maintain full access at all times to ensure no disruption to their normal trading activities. Deliveries were scheduled to avoid peak trading times and road cleanliness was maintained regularly by deploying a road sweeper.

The PFS project provided both PLG & HGV Fuel forecourts using a pressure fuel system providing four PLG pumps and two HGV. A state of the art carwash facility and new outlet for the Marks & Spencer Simply Food store.

The drainage system included a surface water attenuation tank with a storage capacity of 105m3 and a Hydro-brake flow control valve achieving a discharge rate of 3.0l/s. This ensured water discharge from site was within the capabilities of the existing drainage infrastructure.