The scope of work was to decommission and demolish the existing petrol filling station and construct a new 24/7 operational filling station with the sales building to include the Simply Food M&S offer.
The site had specific requirements as it was located directly under overhead high voltage electrical transition lines. The existing ground levels were reduced and retaining walls were constructed to neighbouring boundaries to accommodate the increased site area and overhead lines.
A specialised forecourt canopy was constructed acting as a Faraday cage to protect the site from the overhead transition cables along with an extensive electrical earthing system.